How to Plan Filament for Multiple Projects
How can several pending jobs share stock without promising the same grams twice?
Work through the process
- Add each project and its per-item material requirements.
- Allocate a compatible spool to each requirement, including color.
- Review gaps before purchasing, and release reservations for cancelled work.
Formula and worked illustration
If a 500 g spool has 320 g reserved, only 180 g is free. A second 220 g request can receive 180 g and retain a 40 g gap.
Inputs and limits
Reservations are planning commitments. Only measured completion reduces physical stock. Editing a project releases its old commitments for review.
Browser records are origin-specific and may be evicted. See MDN’s storage documentation for background on retention limits.
Use the Multi-Project Filament Planner to change the assumptions and compare your own inputs. Examples here are illustrative calculations, not results from a physical print test.